Attachment A:  Material Cost Changes
Bid Bid Actual Actual
Bid Price Cost per Price Cost for
Item Quanity per Unit Item per Unit Bid Qty
$ $ $ $
11 7/8 x 1 3/4 Versalam ft 4 5.31 21 0
11 7/8 x 3 1/2 Versalam ft 34 11.53 392 0
11 7/8 BCI 450 ft 1404 1.72 2415 0
11 7/8 Versarim ft 340 3.16 1074 0
1x4 WRC ft 320 0.62 198 0
2x2 WRC ft 54 0.43 23 0
2x12 D'fir #2/btr ft 72 2.25 162 0
2x4 8' studs ea 135 2.86 386 0
2x4 pressure treated ea 22 0.66 15 0
2x4 std/btr ft 1854 0.41 760 0
2x4 WRC ft 696 1.54 1072 0
2x6 8' studs ea 183 4.76 871 0
2x6 #2/btr ft 3865 0.64 2474 0
2x6 pressure treated ft 236 1.02 241 0
2x6 WRC ft 130 1.67 217 0
2x8 pressure treated ft 340 1.39 473 0
2x8 WRC ft 380 2.63 999 0
4x4 D'fir #1/btr ft 24 1.65 40 0
4x4 PT ft 8 1.58 13 0
4x4 WRC ft 8 2.7 22 0
4x6 D'fir #2/btr ft 7 2.07 14 0
4x8 D'fir #2/btr ft 14 2.79 39 0
4x12 D'fir #2/btr ft 31 4.17 129 0
1 1/4 x 6 x 16 Trex ea 40 35.18 1407 0
6x12 D'fir #2/btr ft 159 6.21 987 0
6x6 D'fir #1 ft 162 3.86 625 0
7"x8' shinglepanel ea 66 17.70 1168 0
7/16 4x9 OSB ea 134 19.95 2673 0
3/4 4x8 OSB t&g ea 69 27.35 1887 0
4x8 Breckenridge ea 38 47.19 1793 0
5/8 4x8 OSB ea 71 20.38 1447 0
5/4 x 8 WRC RB ft 5600 1.5 8400 0
Trusses set 1 3500 3500 0