The data presented below is typical of a cost breakdown presented as the Contractors bid, often required by the lending bank or other agency. It is recommended that you request at least this much information from anyone bidding for your work.
|
Mountain Tech Builders |
|||||||
|
727 Alpine Road |
|||||||
|
Mount Shasta, CA 96067 |
|||||||
| (530) 926-5863 | |||||||
|
Owner: |
Ken Cardon |
||||||
|
Project Address: |
Lake Shastina Drive |
||||||
|
City: |
Weed |
||||||
|
County: |
Siskiyou |
Date: |
5/2/98 |
||||
|
Estimated |
|||||||
|
Costs |
|||||||
|
1 |
Building Permits, School Fees |
3077 |
|||||
|
2 |
Utility Fees |
3935 |
|||||
|
3 |
Survey |
0 |
|||||
|
4 |
Temporary Facilities |
300 |
|||||
|
5 |
Site Preparation |
0 |
|||||
|
6 |
Earthwork, Septic, Utility |
2577 |
|||||
|
7 |
Concrete Forms |
included in #8 |
|||||
|
8 |
Structural Concrete |
8500 |
|||||
|
9 |
Lumber |
13729 |
|||||
|
10 |
Lumber- interior trim |
590 |
|||||
|
11 |
Framing Labor |
12100 |
|||||
|
12 |
Finish Labor |
1500 |
|||||
|
13 |
Doors and Frames |
1789 |
|||||
|
14 |
Windows |
2662 |
|||||
|
15 |
Cabinets & Millwork |
5780 |
|||||
|
16 |
Hardware- framing |
1138 |
|||||
|
17 |
Hardware- finish |
255 |
|||||
|
18 |
Pilings |
||||||
|
19 |
Reinforcing Steel |
included in #8 |
|||||
|
20 |
Structural Steel |
||||||
|
21 |
Plumbing- rough |
5162 |
|||||
|
22 |
Plumbing- finish |
1290 |
|||||
|
23 |
Electrical- rough |
3410 |
|||||
|
24 |
Electrical- finish |
1312 |
|||||
|
25 |
Roof Trusses |
2722 |
|||||
|
26 |
Roof Cover |
4580 |
|||||
|
27 |
Structural Masonry |
||||||
|
28 |
Masonry Veneer |
0 |
|||||
|
29 |
Stucco Exterior |
||||||
|
30 |
Special Exterior |
||||||
|
31 |
Heating, Vent, Air Cond. |
5180 |
|||||
|
32 |
Glass & Glazing |
included in #14 |
|||||
|
33 |
Sheetmetal and Flashing |
included in #26, #31 |
|||||
|
34 |
Sheetrock |
5243 |
|||||
|
35 |
Insulation & Soundproofing |
4418 |
|||||
|
36 |
Tilework |
700 |
|||||
|
37 |
Finish Flooring |
1800 |
|||||
|
38 |
Painting & Decorating |
1000 |
|||||
|
39 |
Sprinkler System |
||||||
|
40 |
Elevator |
||||||
|
41 |
Shower doors, Bath Accessories |
445 |
|||||
|
42 |
Built-ins & Appliances |
1368 |
|||||
|
43 |
Shades and Blinds |
||||||
|
44 |
Misc Metal, Gutters |
0 |
|||||
|
45 |
Fences, Retaining Walls |
||||||
|
46 |
Fireplaces, Wood Stoves |
0 |
|||||
|
47 |
Window Screens |
included in #14 |
|||||
|
48 |
Garage Doors |
645 |
|||||
|
49 |
Cleanup |
0 |
|||||
|
50 |
Drainage Piping |
||||||
|
51 |
Landscaping |
||||||
|
52 |
Driveway |
1200 |
|||||
|
53 |
Concrete walks, Patio, Stairs |
0 |
|||||
|
54 |
Insurance- Workers Comp |
included in line items |
|||||
|
55 |
Payroll Taxes |
included in line items |
|||||
|
56 |
Supervision |
||||||
|
57 |
Rental Equipment |
0 |
|||||
|
58 |
|||||||
|
59 |
|||||||
|
60 |
|||||||
|
61 |
Arch & Engineer Fees |
100 |
|||||
|
62 |
Contractor's Labor, Overhead, Profit |
7000 |
|||||
|
Total Bid |
105506 |
||||||